| No |
Nama Pekerjaan |
Divisi |
Diterima |
Selesai |
Nominal |
Keterangan |
Progres |
Diserahkan |
Lihat PDF |
| 01 | HPS Jasa operator AMDK dan Tenaga Sedot Tinja |
Aset |
05 November 2024 |
05 November 2024 |
Terlampir |
- |
- |
05 November 2024 |
 |
| 02 | Pengecatan jembatan pipa 4 lokasi ( Depan pasar Kleco, Underpass Transito, Jln. Sadewa serengan, Danusuman ) |
Aset |
11 November 2024 |
19 November 2024 |
Terlampir |
- |
- |
19 November 2024 |
 |
| 03 | HPS Tarif LLTT untuk 5 Kelurahan TA 2025 |
Limbah |
11 November 2024 |
14 November 2024 |
Terlampir |
- |
- |
14 November 2024 |
 |
| 04 | KAK pekerjaan jasa konsultansi review DED JDU dan Update data calon pelanggan Wosusokas |
Renbang |
11 November 2024 |
11 November 2024 |
Terlampir |
- |
- |
11 November 2024 |
 |
| 05 | Pengangkatan lumpur kolam SDB IPLT Putri Cempo |
Limbah |
12 November 2024 |
13 November 2024 |
15.147.000 |
- |
- |
18 November 2024 |
 |
| 06 | Pengangkatan lumpur kolam fakultatif IPLT Putri Cempo |
Limbah |
12 November 2024 |
13 November 2024 |
11.011.000 |
- |
- |
18 November 2024 |
 |
| 07 | Pengangkatan lumpur kolam maturasi IPLT Putri Cempo |
Limbah |
12 November 2024 |
13 November 2024 |
5.366.000 |
- |
- |
18 Novemberv 2024 |
 |
| 08 | Tarif LLTT Divisi Limbah Untuk 5 Kecamatan |
Limbah |
14 November 2024 |
14 November 2024 |
Terlampir |
- |
- |
14 November 2024 |
 |
| 09 | Pembuatan pipa penyalur udara untuk kolam aerasi sistem blower IPAL semanggi |
Limbah |
19 November 2024 |
19 November 2024 |
37.671.000 |
- |
- |
19 November 2024 |
 |
| 10 | Pembuatan instalasi sistem blower dan pengadaan pompa blower untuk kolam aerasi IPAL semanggi |
Limbah |
19 November 2024 |
19 November 2024 |
87.024.000 |
- |
- |
19 November 2024 |
 |