No Nama Pekerjaan Bidang Diterima Selesai Nominal Keterangan Progres Diserahkan Lihat PDF
01 Pembuatan pintu gerbang depan kantor IPLT putri cempo Limbah 01 November 2021 05 November 2021 9.390.100 - - 09 November 2021
02 Pengangkatan lumpur kolam anaerob 2 dan SDB IPLT putri cempo Limbah 01 November 2021 03 November 2021 37.325.000 - - 04 November 2021
03 Pengamanan dan pemindahan pipa air bersih jembatan junasan NRW 03 November 2021 08 November 2021 184.774.000 - - 09 November 2021
04 Pembuatan siphon pipa air baku dia. 350 mm - dia. 400 mm dan air distribusi dia. 150 mm taman lansia jln. kihajar dewantoro - KH. maskuri NRW 03 November 2021 09 November 2021 38.043.000 Siphon pipa air baku dia. 350 mm - dia. 400 mm Revisi 10 November 2021
29.690.000 Siphon pipa air distribusi dia. 150 mm Revisi 10 November 2021 -
05 Rewending pompa bypass 19 KW grid chamber dan bak equalisasi IPAL mojosongo Limbah 04 November 2021 05 November 2021 22.206.000 - - 09 November 2021
06 Rewending pompa aerator kolam aerasi IPAL mojosongo Limbah 04 November 2021 05 November 2021 9.664.000 - - 09 November 2021
07 Perbaikan body pompa aerator IPAL mojosongo Limbah 04 November 2021 05 November 2021 6.093.700 - - 09 November 2021
08 Rewending pompa sumppump air limbah no. 2 ebara 5,5 KW IPAL pucangsawit 1 Limbah 05 November 2021 05 November 2021 9.939.000 - - 09 November 2021
09 Perbaikan as pompa aerator 1 unit IPAL kedungtungkul mojosongo Limbah 08 November 2021 09 November 2021 7.579.000 - - 10 November 2021
10 RAB Penyedotan dengan pompa alkon pada jaringan sekunder di jalan popda upah tenaga dan BBM bulan November Limbah 15 November 2021 15 November 2021 2.164.000 - - 16 November 2021
11 Pekerjaan siphon pipa dia. 8" (200mm) Jl. MT Haryono NRW 17 November 2021 17 November 2021 54.020.000 Upah + Bahan Revisi 17 November 2021
20.723.000 Upah Saja Revisi 17 November 2021 -
12 Pembuatan sticker nomor pelanggan verifikasi SR Hibah Air Limbah Tahap 2 (HAL 2) Limbah 18 November 2021 18 November 2021 2.200.000 - - 22 November 2021
13 Pemasangan jaringan baru terdampak proyek box culvert jl. Adi Sumarmo NRW 18 November 2021 18 November 2021 58.346.000 Ruas Utama 198 m - 18 November 2021
35.340.000 Pekerjaan Tambahan 102 m - 18 November 2021 -
14 Pekerjaan pengamanan pipa air baku dia. 400 m dan 350 mm jl. KH Dewantoro NRW 18 November 2021 18 November 2021 44.640.000 Air Baku Final 18 November 2021
29.927.000 Distribusi Final 18 November 2021 -
15 Pembuatan siphon pipa dia. 8" (200 mm) Jl. MT. Haryono NRW 18 November 2021 18 November 2021 32.592.000 Upah + Bahan Final 18 November 2021
21.120.000 Upah Saja Final 18 November 2021 -
16 Pembuatan DED pengamanan dan pemindahan pipa dia. 6" - 150 mm Jl. DI. Panjaitan NRW 23 November 2021 27 November 2021 213.583.000 Metode HDD - 30 November 2021
72.515.000 Metode Jembatan WF - 30 November 2021 -
17 Appraisal KAK dan DED pengadaan bahan kimia Renbang 23 November 2021 24 November 2021 - Data Analisa - 24 November 2021
18 Renovasi bak screen imhoof tank IPLT Putri Cempo Limbah 26 November 2021 02 Desember 2021 13.753.000 - - 06 Desember 2021
19 Peninggian landasan akses armada truck tinja imhoof tank IPLT putri cempo Limbah 26 November 2021 02 desember 2021 14.161.000 - - 06 Desember 2021
20 RAB Pembayaran enumerator, pembuatan barcode pelanggan L2T2 dan jasa penempelan barcode pendataan septictank sedotable Limbah 29 November 2021 05 Desember 2021 15.775.000 - - 07 Desember 2021